Solid waste incinerator placed in a container

Solid waste incinerator placed in a container

Solid waste incinerator, productivity 100kg/h placed in a container.  Dimensions: 2,45×12,2m and 2,9m in height.   Operates natural gas with the pressure of 0.005 MPa and consumption of 0,21-0,23 m3 per kg of waste. Installed power – 55 kW. Total 3 units. Fuel capacity:200l or more Incinerator has a temperature monitoring system in place Wet scrubber capable of removing sulpur dioxide in the fumes Water capacity of 2000l or more Incinerator temeprature above 950 degree celsius Incinerator used a dual chamber system for incinerator Capacity per hour at least 25kg 1. A combustion chamber : a. watertight door for manual loading of waste. b . A burner start is limited to inflammation of waste . 2. A camera post-combustion gases : a. burner combustion , low power . b . An injection device air for total recombustion of the gases . c . An input device cooling air of the combustion gases. d . A smoke evacuation duct .   3. A control panel ensuring complete combustion cycle .  …

Solid waste incinerator placed in a container

Solid waste incinerator placed in a container

Solid waste incinerator, productivity 100kg/h placed in a container.  Dimensions: 2,45×12,2m and 2,9m in height.   Operates natural gas with the pressure of 0.005 MPa and consumption of 0,21-0,23 m3 per kg of waste. Installed power – 55 kW. Total 3 units. Fuel capacity:200l or more Incinerator has a temperature monitoring system in place Wet scrubber capable of removing sulpur dioxide in the fumes Water capacity of 2000l or more Incinerator temeprature above 950 degree celsius Incinerator used a dual chamber system for incinerator Capacity per hour at least 25kg 1. A combustion chamber : a. watertight door for manual loading of waste. b . A burner start is limited to inflammation of waste . 2. A camera post-combustion gases : a. burner combustion , low power . b . An injection device air for total recombustion of the gases . c . An input device cooling air of the combustion gases. d . A smoke evacuation duct .   3. A control panel ensuring complete combustion cycle .  …

Solid waste incinerator placed in a container

Solid waste incinerator placed in a container

Solid waste incinerator, productivity 100kg/h placed in a container.  Dimensions: 2,45×12,2m and 2,9m in height.   Operates natural gas with the pressure of 0.005 MPa and consumption of 0,21-0,23 m3 per kg of waste. Installed power – 55 kW. Total 3 units. Fuel capacity:200l or more Incinerator has a temperature monitoring system in place Wet scrubber capable of removing sulpur dioxide in the fumes Water capacity of 2000l or more Incinerator temeprature above 950 degree celsius Incinerator used a dual chamber system for incinerator Capacity per hour at least 25kg 1. A combustion chamber : a. watertight door for manual loading of waste. b . A burner start is limited to inflammation of waste . 2. A camera post-combustion gases : a. burner combustion , low power . b . An injection device air for total recombustion of the gases . c . An input device cooling air of the combustion gases. d . A smoke evacuation duct .   3. A control panel ensuring complete combustion cycle .  …

Incinerator machine for habitants

Incinerator machine for habitants

the island does not have medical waste & other waste incinerators. we are in the process of exploring the feasabilty and setting up an incinerator facility on the island of Aruba. this is an island of 120.000 habitants. we have 2 hospitals,more then 20 dentist offices,and over 50 doctor offices. would it be possible to give us info on the capacity of incinerator we need on this island. Is it built to run on LPG or natural gas? Quotation says freight is included –  is this just to our port, and if so, which portWhat method of transportation is then required to the final location (so I can obtain appropriate quotes). What installation is required onsite besides the chimney and gas connection? 1.Electrically(automatic) controlled but fuelled by diessel    Can also be controlled manually for rural areas with electricity challenge 2.Incineration of both dry and wet contaminated hospital waste materials 3.60 kg capacity per session 4.Rate of 23 kg per hour we are looking for an Incinerator machine with the capacity of 200- 300 kgs per for incinerating Hospital and Hazardous Waste to be installed here in Tanzania.

Incinerator machine for habitants

Incinerator machine for habitants

the island does not have medical waste & other waste incinerators. we are in the process of exploring the feasabilty and setting up an incinerator facility on the island of Aruba. this is an island of 120.000 habitants. we have 2 hospitals,more then 20 dentist offices,and over 50 doctor offices. would it be possible to give us info on the capacity of incinerator we need on this island. Is it built to run on LPG or natural gas? Quotation says freight is included –  is this just to our port, and if so, which portWhat method of transportation is then required to the final location (so I can obtain appropriate quotes). What installation is required onsite besides the chimney and gas connection? 1.Electrically(automatic) controlled but fuelled by diessel    Can also be controlled manually for rural areas with electricity challenge 2.Incineration of both dry and wet contaminated hospital waste materials 3.60 kg capacity per session 4.Rate of 23 kg per hour we are looking for an Incinerator machine with the capacity of 200- 300 kgs per for incinerating Hospital and Hazardous Waste to be installed here in Tanzania.

General wastes incinerators

General wastes incinerators

General wastes produced on a daily basis  include paper, plastic, organic materials, boxes, plastic containers, leaves, etc; Total waste produced per day: 10-12 tonnes; Hours of Operation: 10 hours a day; Fuel requirement: Diesel or waste oil preferred but LP gas will be considered; I also need a few some information on the installation i.e. spacing, building size, maintenance requirements, spare parts backing, PM inspections sheets, the number of employees required to operate the plant once operational etc.  Other necessary information include the benefits of using the incinerator system, operating costs, power consumption, operation, waste disposal, PPE requirements, safety information, environmental concerns if any, disadvantages if any, etc. I will like to know your best prices for Grate Combustion Incinerator of sizes of between 700 tons/day to 200 tons/day. Also, state other available incinerators available and the cost of all the accompanying equipment for installation. The incinerating system should have the capacity to supply electricity, less harmful, not so technical to enable semi skilled operators and a few skilled operators, environmentally friendly and also not so expensive to acquire and maintain.

General wastes incinerators

General wastes incinerators

General wastes produced on a daily basis  include paper, plastic, organic materials, boxes, plastic containers, leaves, etc; Total waste produced per day: 10-12 tonnes; Hours of Operation: 10 hours a day; Fuel requirement: Diesel or waste oil preferred but LP gas will be considered; I also need a few some information on the installation i.e. spacing, building size, maintenance requirements, spare parts backing, PM inspections sheets, the number of employees required to operate the plant once operational etc.  Other necessary information include the benefits of using the incinerator system, operating costs, power consumption, operation, waste disposal, PPE requirements, safety information, environmental concerns if any, disadvantages if any, etc. I will like to know your best prices for Grate Combustion Incinerator of sizes of between 700 tons/day to 200 tons/day. Also, state other available incinerators available and the cost of all the accompanying equipment for installation. The incinerating system should have the capacity to supply electricity, less harmful, not so technical to enable semi skilled operators and a few skilled operators, environmentally friendly and also not so expensive to acquire and maintain.